Ferrocement Water Tank. OverHead 130 Meters.

This new project is manufacturing of 65 KL 126 Nos. OH Ferrocement Water Tank.

The Structure

This is  a skeleton system structure wherein the whole structure is fabricated first using 12 mm, 10 mm Steel Bars.

The Wall is supported By 150 mm Ribs every 900 mm


The Sleeves Have been welded on the structure using a plate.



After The structure The casting was done  and then Finished in and out using Cement Sand Ratio 1:2.5.

The tanks are Cured 3 Times a Day Regularly for 2m Weeks and Water is Loaded after 3 Days of Completion of Inner Finishing.



The Patches are Cleared in a Week time.